Remove screws and slide out the hardwire assembly .
Attach an input conduit and if required, an output conduit .
Larger holes can be punched if necessary.
Detach the strain relief panel using nuts for easier access.
q
q
Symmetra LX
Rack-mount UPS
Symmetra LX
Tower UPS
Complete Pre-installation Checklist
Check that the circuit breaker to be used to power the UPS is in the
OFF position.
Check that the input circuit breaker on the UPS is in the OFF
position.
Before beginning the electrical installation, perform the following procedures.
1
Read, understand and follow ALL safety instructions contained in
the
Failure to follow safety instructions and warnings could
result in equipment damage, serious injury, or death.
Symmetra LX Safety Instructions and General Information
Guide.
Electrical
Hazard Maximum
Load
Maximum
Load
8 kVA
Circuit
Breaker
Rating*
Circuit
Breaker
Rating*
50 A
Connection
Connection
§
§
§
§
§
40 in-lb
4.5 -m)
1-phase: 3-Wire
-Wire (
External circuit breaker
#3 AWG (25 mm )
Torque to
( N
(L1-N-G)
3-phase: 5 L1-L2-
L3-N-G)
2
§
§
§
§
§
40 in-lb
4.5 -m)
1-phase: 3-Wire
-Wire (
External circuit breaker
#6 AWG (16 mm )
Torque to
( N
(L1-N-G)
3-phase: 5 L1-L2-
L3-N-G)
2
Voltage
(Vac)
Voltage
(Vac)
16 kVA 100 A
1-phase:
220 or 230
or 240
3-phase:
380 or 400
or 415
1-phase:
220 or 230
or 240
3-phase:
380 or 400
or 415
8 kVA 50 A §
§
§
§
40 in-lb
4.5 -m)
1-phase: 3-Wire
External circuit breaker
#6 AWG (16 mm )
Torque to
( N
(L1-N-G)
2
§
§
6 (IEC 320 C19) sockets
with 6 (15A, 250V) circuit
breakers
8 (IEC 320 C13) sockets
with 2 (10A 250V) circuit
breakers
16 kVA 100 A
220 or
230 or
240
220 or
230 or
240
§
§
§
§
40 in-lb
4.5 -m)
1-phase: 3-Wire L1 G
External circuit breaker
#3 AWG (25 mm )
Torque to
( N
( -N- )
2
§
§
10 (IEC 320 C19) sockets
with 10 (15A, 250V) circuit
breakers)
8 (IEC 320 C13) sockets
with 2 (10A 250V) circuit
breakers
Input Connections: Tower and Rack-mount UPS
Method
Method
Hardwired
(Standard on
tower and
rack-mount)
Hardwired
(Standard on
tower and
rack-mount)
Hardwired
(Standard on
tower and
rack-mount)
Hardwired
(Standard on
tower and
rack-mount)
Output
sockets
(Standard on
rack-mount)
Output
sockets
(Standard on
rack-mount)
220 or
230 or
240
220 or
230 or
240
§
§
§
Refer to local and national codes. Many locations require hardwiring
by a licensed electrician.
Strain relief is required for all hardwiring.
All openings in the hardwire assembly must be covered. Failure to
do so may result in personal injury or equipment damage.
Hardwire the UPS
2
1.1
1.2
Caution
®
®
All UPS configurations can be wired 3-phase in / 1-phase out, or
1-phase in / 1-phase out.
Note
!
!
!
!!
Output Connections: Tower and Rack-mount UPS
2.1
2.2
990-1540B-001, 04/2006
Important Safety and Installation Instructions
This manual provides instructions on the wiring and connections for the
Symmetra LX tower and rack-mount UPS.
All electrical power and power control wiring must be installed by a qualified
electrician and comply with local and national regulations.
See and retain the product documentation shipped with your system for
other important installation, operation, and maintenance instructions.
Illustrations are representative. Your Symmetra LX configuration, including
components and optional APC equipment, may be different from the models
shown in this guide.
Entire contents copyright 2006 by American Power Conversion Corporation.
All rights reserved. Reproduction in whole or in part without permission is
prohibited.
Symmetra LX
Electrical Installation Guide
Tower and Rack-mount UPS
®
For use with Symmetra LX UPS Models:
APC, the APC logo, PowerChute, InfraStruXure, Smart-UPS and Symmetra
are registered trademarks of American Power Conversion Corporation. All
other trademarks are the property of their respective owners.
Electrical Installation
* Recommended
** Note: Wire connection “G” represents protective earth ground .
220/230/240 V, 4 8 kV A
220/230/240 V, 4 16 kV A
24
Vdc
Attach an input cable and an output cable (if required) , to
the terminal block .
Pull the wires through the conduit into the hardwire assembly.
Reinstall the hardwire assembly with provided screws .
Test the wiring.
Turn on the utility power, the input circuit breaker , and the
system enable switch . If the Vin value on the display does
not match your branch voltage, check the input wiring.
Check the output wiring by turning on the maintenance bypass
switch .
§
§
§
§
§
Connect to the terminal block as indicated on the label ,
using a torque of 40 in-lb (4.5 N-m).
For 1-phase wiring, use L1, N, and G only. For 3-phase wiring,
use L1, L2, L3, N, and G only.
Cover the unused holes in the strain relief panel.
Inspect cable connections to ensure proper installation.
Reattach the strain relief panel with nuts .
Turn OFF the input circuit breaker and maintenance bypass
switch.
3
2
If your configuration includes an additional management accessory
card, install in the empty slot on the rear of the UPS. See the
accompanying documentation for installation instructions.
Loads can be connected directly to the UPS using the output
sockets on the PDU panel. Ensure that the total load being plugged
into a PDU panel DOES NOT EXCEED the branch circuit breaker
rating on the PDU panel.
Install PDU Panel(s) and Connect Loads to the UPS,
If Applicable
5
Your configuration may include optional PDU panels. Refer to the PDU
installation guide.
Note
!
!
!
!!
Remove the access panel to connect the circuits .
If your installation will use an external switch contact, connect
the REPO switch with the pre-installed jumper , as shown.
If your installation will use a switch contact and a 24 V power supply
external to the UPS, remove the jumper and connect the REPO
switch, as shown.
§
§
In many locations, the Remote Emergency Power Off
(REPO) switch must be installed by a licensed electrician.
Refer to local and national codes.
See the
for REPO requirements and detailed safety instructions.
Safety and General Information GuideSymmetra LX
Note
!
!
!
!!
Connect Remote Emergency Power Off (REPO)
Circuit, If Required
Hardwire the UPS (continued)
Install Accessory Card, If Applicable
4
3.1
3.2
3.3
2.3
2.4
2.5
2.6
2.7
2.8
L1
OUTPUT
N
INPUT
L1L2L3N
Note
!
!
!
!!
L1
OUT PU T
N
INPUT
L1L2
L3N
Especificaciones del producto
Marca: | Apc |
Categoría: | Unión Postal Universal |
Modelo: | Symmetra LX 16kVA N+1 |
¿Necesitas ayuda?
Si necesitas ayuda con Apc Symmetra LX 16kVA N+1 haz una pregunta a continuación y otros usuarios te responderán
Unión Postal Universal Apc Manuales
18 Octubre 2024
12 Octubre 2024
12 Octubre 2024
12 Octubre 2024
12 Octubre 2024
12 Octubre 2024
12 Octubre 2024
12 Octubre 2024
12 Octubre 2024
4 Octubre 2024
Unión Postal Universal Manuales
- Unión Postal Universal AEG
- Unión Postal Universal IKEA
- Unión Postal Universal HP
- Unión Postal Universal Lenovo
- Unión Postal Universal Tripp Lite
- Unión Postal Universal Energenie
- Unión Postal Universal Voltcraft
- Unión Postal Universal Adj
- Unión Postal Universal Digitus
- Unión Postal Universal LevelOne
- Unión Postal Universal Eaton
- Unión Postal Universal CyberPower
- Unión Postal Universal Block
- Unión Postal Universal Avocent
- Unión Postal Universal Minuteman
- Unión Postal Universal Maruson
- Unión Postal Universal V7
- Unión Postal Universal Phoenix Contact
- Unión Postal Universal Puls Dimension
- Unión Postal Universal Salicru
- Unión Postal Universal Equip
- Unión Postal Universal Murr Elektronik
- Unión Postal Universal Altronix
- Unión Postal Universal Ditek
- Unión Postal Universal Bxterra
- Unión Postal Universal Middle Atlantic
- Unión Postal Universal FSP
- Unión Postal Universal Atlantis Land
- Unión Postal Universal PowerWalker
- Unión Postal Universal FSP/Fortron
- Unión Postal Universal Online USV
Últimos Unión Postal Universal Manuales
24 Octubre 2024
22 Octubre 2024
22 Octubre 2024
22 Octubre 2024
20 Octubre 2024
18 Octubre 2024
11 Octubre 2024
9 Octubre 2024
9 Octubre 2024
6 Octubre 2024