CyberPower BP36V60ART2U Manual de Usario

Lee a continuación 📖 el manual en español para CyberPower BP36V60ART2U (14 páginas) en la categoría No categorizado. Esta guía fue útil para 3 personas y fue valorada con 4.5 estrellas en promedio por 2 usuarios

Página 1/14
Users Manual
EXTENDED BATTERY MODULE (EBM)
BP36V60ART2U
BP72V60ART2U
Cyber Power Systems (USA), Inc.
4241 12th Avenue East Suite 400 Shakopee, MN 55379
Phone: -297-6937 877
Fax: 952-403-0009
http://www.cyberpowersystems.com
K01-0000 5-03 51
Copyright © Cyber Power Systems, Inc.2020
OVERVIEW
1
The CyberPower extended battery modules (BP V60ART2U V ART2U) support A polarized plugs, and are designed for variety of Cyber Power 36 / BP72 60 60
UPS systems. When combining with the UPS, the provides extended runtime with a VDC/72VDC external connection. Additional parallel-connected EBM 36
EBM provide the UPS for a longer extended runtime operation.
1K/1.5KVA or 2K/3KVA extended battery module
User’s manual Register card
Rackmount left rail Rackmount right rail
Left hanging bracket Right hanging bracket
IEC320 C14 to NEMA 5-15P power cord
Rackmount ears (Stands) (2)
Tie plate (1)
M5X7L black at head screws (8)
M5X12L black pan head screws ( ) 12
M5X6L silver pan head screws (6)
Plastic washers (8)
Screw hole dust covers ( ) 12
Rubber feet (12)
UNPACKING
Copyright © Cyber Power Systems, Inc.2020
HARDWARE INSTALLATION
2
HARDWARE INSTALLATION
These versatile can be mounted in a rackmount or vertical tower EBM
orientation. This is especially important to growing organizations with
changing needs that value having the option to position an EBM on the
floor or in a rackmount system. Please follow the instructions below for
the respective mounting methods.
SAFETY PRECAUTIONS
CAUTION! To prevent the risk of fire or electric shock, only use the
supplied hardware to attach the mounting brackets.
RACKMOUNT INSTALLATION R 4-POST RACK FO
Step 1 Remove the dust covers :
Remove the dust covers *5 pcs from the screw holes.
Step 2: Rackmount e s & hanging brackets installation ar
Attach two rackmount ears to the EBM using the provided M5X7L*8pcs
screws and tighten two hanging brackets with the M5X6L*6pcs screws.
Step 3: Rackmount rail Installation
The rails adjust to mount in 48-cm (19-inch) wide racks from 52 to
91.5cm (20.5 to 36 inches) deep. Select the proper holes in the rack for
positioning the in the rack. The takes up 2 rack units. EBM EBM
Position the guide screws on the rails into the rear rack square holes to
temporarily support the rails in place. Tighten the front rail screws on the
rack.

Especificaciones del producto

Marca: CyberPower
Categoría: No categorizado
Modelo: BP36V60ART2U
Color del producto: Wit
Peso.: 220 g
Ancho: 135 mm
Profundidad: 138 mm
Altura: 33 mm
Colocación: Table, Wall
Número de puertos Ethernet LAN (RJ-45): 1
Opción de montaje de bloqueo de cable: Ja
Tipo de ranura para candado de cable: Kensington
Consumo de energía (máx.): 9 W
Conexión para adaptador de red: Ja
LAN Ethernet, velocidades de transferencia de datos: 10,100,1000 Mbit/s
Estándar de red: IEEE 802.11a, IEEE 802.11ac, IEEE 802.11b, IEEE 802.11g, IEEE 802.11n
Algoritmos de seguridad compatibles: WPA-PSK, WPA-TKIP, WPA2-AES
Interno: Ja
Gestión basada en web: Ja
Corriente de salida: 1 A
Abarcando: 12 V
Servidor DHCP: Ja
Velocidad máxima de transferencia de datos: 867 Mbit/s
2,4GHz: Ja
5GHz: Ja
Calidad de servicio (QoS): Ja
VLAN=soporte: Ja
Alimentación a través de Ethernet (PoE): Ja
Funciones de antena: Ingebouwde antenne
Consumo de energía (típico): 7.1 W
Temperatura de funcionamiento (TT): 0 - 40 °C
Humedad relativa de funcionamiento (VV): 10 - 95 procent

¿Necesitas ayuda?

Si necesitas ayuda con CyberPower BP36V60ART2U haz una pregunta a continuación y otros usuarios te responderán




No categorizado CyberPower Manuales

No categorizado Manuales

Últimos No categorizado Manuales