Ventev ID-HCEN-515 Manual de Usario

Lee a continuación 📖 el manual en español para Ventev ID-HCEN-515 (4 páginas) en la categoría Niet gecategoriseerd. Esta guía fue útil para 2 personas y fue valorada con 4.5 estrellas en promedio por 2 usuarios

Página 1/4
Hard Lid Ceiling Enclosure
Installation Manual
Rev. 061924
211126 McCormick Road, Hunt Valley, MD 21031 | 800-851-4965 | sales@ventev.com | ventevinfra.com | Rev. 061924
Ventev Hard Lid Ceiling Enclosure Instructions
Step 1
The enclosure comes with four ¼ in. holes spaced on
16 in. centers as shown. It is recommended to center
the holes with studs in the ceiling. Access Point (AP)
not included.
Step 2
A 14 x 14 in. square hole is required to be cut into
the ceiling to allow the enclosure to be recessed
into the ceiling.
Step 3
Slide the enclosure into the hole and secure to the ceiling with the appropriate hardware for the type of installation
you are encountering. For studs, use #12 x 1.5 in. wood screws. If mounting to other materials use the correct wall
anchors to support the enclosure plus the weight of the AP of approximately 5 lbs.
Enclosure Base
311126 McCormick Road, Hunt Valley, MD 21031 | 800-851-4965 | sales@ventev.com | ventevinfra.com | Rev. 061924
Cisco Access Point Instructions
Step 4
Remove the door from
the ceiling tile assembly
by pulling the heads of
the two spring pins that
act as the door hinge.
Aruba Access Point Instructions
(500 Series and Newer)
Step 4
Remove the door from
the ceiling tile assembly
by pulling the heads of
the two spring pins that
act as the door hinge.
Step 5
Remove the four screws or nuts that hold the
AP Mounting Bracket to the door.
Step 6
Place AP in door from the
front side. Slide the cross
bar onto the AP mounting
feet from the back side.
Step 5
Remove the two screws that hold the AP cross bar to
the door stand offs.
Step 6
Remove the black factory mount from the AP and
retain the two screws.
Step 7
Place AP in door from
the front side. Screw the
cross bar onto the AP
from the back side using
the screws that were
removed from the AP.
Step 7
Attach the cross bar to the door with four
screws or nuts.
Step 8
Run the RJ 45 cable into the large hole in the
tray of the enclosure and secure the wire with
the romex connector.
Step 9
Attach door assembly to installed base in the
ceiling and attach RJ45 cable to AP.
Step 10
Close the door and lock.
Step 8
Attach the cross bar to the door with the two screws
from step five.
Step 9
Run the RJ 45 cable into the large hole in the
tray of the enclosure and secure the wire with
the romex connector.
Step 10
Attach door assembly to installed base in the
ceiling and attach RJ45 cable to AP.
Step 11
Close the door and lock.

Especificaciones del producto

Marca: Ventev
Categoría: Niet gecategoriseerd
Modelo: ID-HCEN-515

¿Necesitas ayuda?

Si necesitas ayuda con Ventev ID-HCEN-515 haz una pregunta a continuación y otros usuarios te responderán




Niet gecategoriseerd Ventev Manuales

Niet gecategoriseerd Manuales

Últimos Niet gecategoriseerd Manuales