LaCie 12big Rack Fibre Manual de Usario

LaCie servidor 12big Rack Fibre

Lee a continuación 📖 el manual en español para LaCie 12big Rack Fibre (13 páginas) en la categoría servidor. Esta guía fue útil para 6 personas y fue valorada con 4.5 estrellas en promedio por 2 usuarios

Página 1/13
LaCie 12big Rack Fibre and expansion Table of Contents
Quick Install Guide page 1
Table of Contents
1. Introduction ............................................................................................................. 2
1.1. Safe Handling .............................................................................................................................. 2
1.2. Safety .......................................................................................................................................... 2
1.3. Rack System Precautions ............................................................................................................... 2
1.4. Battery Disposal ........................................................................................................................... 3
1.5. Power Supply ............................................................................................................................... 3
1.6. ESD Precaution ............................................................................................................................ 3
1.7. SFP Optical Transceiver Precaution ................................................................................................ 3
2. Preparation ............................................................................................................. 4
2.1. Before you begin .......................................................................................................................... 4
2.2. Unpackaging the Storage System .................................................................................................. 4
3. Rack Installation ...................................................................................................... 4
3.1. Rack Installation Prerequisites ........................................................................................................ 4
3.2. Formatting for Mac Users ............................................................................................................. 5
3.3. Installation Preparation ................................................................................................................. 5
3.4. Rack Installation Procedures ....................................................................................................... 5-6
4. Disk Rules and Configuartion .................................................................................. 7
4.1. Disk Slot Arrangement .................................................................................................................. 7
4.2. Disk Configuration Rules............................................................................................................... 7
5. Setup and Cabling ................................................................................................... 7
5.1. SFP Installation ............................................................................................................................ 7
5.2. Ethernet Connection (Embedded StorView) ..................................................................................... 7
5.3. Connecting the Storage System to the Host ................................................................................. 8-9
6. Completing the Installation ..................................................................................... 9
6.1. Connecting the Power Cords ......................................................................................................... 9
6.2. Powering On The System .............................................................................................................. 9
6.3. Initial Setup of Embedded StorView ........................................................................................... 9-11
6.4. Setting up the Embedded StorView Module: Mac OS 11 ..................................................................
EN English
LaCie 12big Rack Fibre and expansion Introduction
Quick Install Guide page 2
Introduction1.
European Regulations
This equipment complies with European Regulations EN
55022 Class A: Limits and Methods of Measurement of Radio
Disturbance Characteristics of Information Technology
Equipments and EN50082-1: Generic Immunity.
USA Federal Communications Commission (FCC)
This equipment has been tested and found to comply with
the limits for a class A digital device, pursuant to part 15 of
the FCC rules.
Safe Handling1.1.
• The enclosure can weigh up to 32 kg (70 lb.). Do not try to
lift it by yourself.
• Before moving the enclosure, always remove the Power
Supplies, Cooling Fan Module, I/O Modules and Disk Disks
to minimize the weight.
• Unplug the Power Supplies and any other cables before you
move the enclosure.
• Do not lift the enclosure by the handles of the Power
Supplies or Cooling Fan Modules. They are not designed
to support the weight.
Safety1.2.
• All plug-in and blank modules are part of the re enclosure
and must only be removed when a replacement can be
immediately installed. The enclosure must not be operated
without all modules in place.
• Unplug the Power Supplies if you believe the system has
become damaged in any way.
• The enclosure must only be operated from a power supply
input voltage range of 100 - 120V or 200 - 240V.
• In order to comply with applicable safety, emission and
thermal requirements no covers should be removed and all
bays/slots must have plug-in modules installed.
• The power cords are the main power disconnect. Ensure
that the socket outlets are located near the equipment and
are easily accessible.
• When powered by multiple power sources, disconnect all
supply power for complete power isolation.
• A safe electrical ground connection must be provided to the
power cords. Check the grounding of the enclosure before
applying power.
• Provide a suitable power source with electrical overload
protection to meet the requirements established by the
specifications.
• Only connect the enclosure to a power source that has
overcurrent protection of 20A or less.
• The equipment must be operated with two power supply
modules.
• To prevent overheating do not operate the enclosure with
one power supply removed for more than 30 minutes.
Rack System Precautions1.3.
The following safety requirements must be
considered when mounting in a rack cabinet.
• The rack design should support the total weight of the
installed enclosures and incorporate stabilizing features
suitable to prevent the rack from tipping or being pushed
over during installation or normal use.
• When loading a rack, ll the rack from the bottom up and
empty from the top down.
• Do not slide more than one enclosure out of the rack at a
time to avoid the danger of the rack toppling over.
• The rack design should take into consideration the
maximum enclosure operating ambient temperature which
is 40°C (104°F).
• The system must be operated with low pressure rear ex-
haust installation (back pressure created by rack doors and
obstacles not to exceed 5 pascals (0.5 mm water gauge)).
• The rack should have a safe electrical distribution system.
It must provide over-current protection for the enclosure and
must not be overloaded by the total number of enclosures
installed. The electrical power consumption rating shown on
the nameplate should be observed.
• The electrical distribution system must provide a reliable
ground for each enclosure in the rack.
LaCie 12big Rack Fibre and expansion Introduction
Quick Install Guide page 3
• Each power supply in each enclosure has a ground
leakage current of 1.8 mA max. at 60 Hz, 264V. The
design of the electrical distribution system must take into
consideration the total ground leakage current from all
supplies in all the enclosures. The rack may require labeling
with HIGH LEAKAGE CURRENT. Ground (earth) connection
is essential before connecting a supply.
The rack when congured with the enclosures must meet
the safety requirements of UL 60950-1 and IEC 60950-1/
EN60950-1.
Battery Disposal1.4.
cauTion: There is a danger of explosion if the RAID
Controller battery is disposed of improperly. Dispose of used
batteries in accordance with the manufacturer’s instructions and
national regulations.
Power Supply1.5.
WaRninG: Do not remove the covers from the Power
Supplies. Danger of electric shock inside. Return them to your
supplier for replacement.
cauTion: If this equipment is used in a manner not specified
by the manufacturer, the protection provided by the equipment
may be impaired.
ESD Precaution1.6.
WaRninG: Ensure that you have installed and checked a
suitable anti-static wrist or ankle strap and observe all
conventional ESD precautions when handling modules and
components. Avoid contact with backplane components and
module connectors, etc. ESD damage is not covered by warranty.
SFP Optical Transceiver 1.7.
Precaution
iMPoRTanT noTe: Class 1 Laser Product. The optical SFP
transceiver modules must be a UL (or other North American
NRTL) RECOGNIZED COMPONENT, and must be approved
by TUV (or other European Product Safety test house) and
the laser in the module must comply with Laser Class 1, US
21 CFR (J) and EN 60825-1. If optical modules are to be
provided and installed by the end user, they must also comply
with the standards listed above.
iMPoRTanT noTe: The optical modules provided and
installed by the end user must be a UL (or other North America
NRTL) RECOGNIZED COMPONENT and must be approved by
TUV (or other European product safety test house), and the laser
in the module must comply with Laser Class 1, US 21 CFR (J)
and EN 60825-1).
cauTion: The RJ45 socket on the RAID Controller is for
Ethernet connection only and must not be connected to a
telecommunications network.

Especificaciones del producto

Marca: LaCie
Categoría: servidor
Modelo: 12big Rack Fibre

¿Necesitas ayuda?

Si necesitas ayuda con LaCie 12big Rack Fibre haz una pregunta a continuación y otros usuarios te responderán




servidor LaCie Manuales

servidor Manuales

Últimos servidor Manuales