PCE Instruments PCE-ORP 3 Manual de Usario

Lee a continuación 📖 el manual en español para PCE Instruments PCE-ORP 3 (9 páginas) en la categoría Equipo de medición. Esta guía fue útil para 4 personas y fue valorada con 4.5 estrellas en promedio por 2 usuarios

Página 1/9
Operation Manual
PCE- 3ORP
Microcomputer Based
ORP & emperature T
Pocket
Meter
PCE-ORP 3
PCE Americas Inc.
711 Commerce Way
Suite 8
Jupiter
FL-33458
USA
From outside US: +1
Tel: (561) 320-9162
Fax: (561) 320-9176
info@pce-americas.com
www.pce-instruments.com/english
www.pce-instruments.com
PCE Instruments UK Ltd.
Unit 11
Southpoint Business Park
Ensign way
Hampshire / Southampton
United Kingdom, SO31 4RF
From outside UK: +44
Tel: (0) 2380 98703 0
Fax: (0) 2380 98703 9
info@pce-instruments.co.uk
CONTENTS
INITIAL INSPECTION AND ASSEMBLY .....................2
BEFORE YOUR FIRST USE........................….............2
A. Replace the Batteries ............................................2
B. Soak the Electrode.... ...........................................2
C. Setup and Calibrate the Electrode and Meter...........2
PCE-ORP 3 ..................... OVERVIEW.. ........................3
A. Meter Description..................................................3
B.
PCE-ORP 3 Graphical Display ...............................3
OPERATION MODES AND KEYPAD OPERATIONS..4
A. Operation Modes...................................................4
B. Keypad Operations ................................................4
USING ...................................5PCE-ORP 3.....................
A. Power ON/OFF ......................................................5
B. Set Date and Time..................................................5
C. Relative ORP calibration.........................................6
D. Measure
…….........................................................6
E. Hold Data ............................................................6
F. Save Data.......... ....................................................6
G. Recall Data ..........................................................7
H. Erase Data .............................................................7
ONGOING MAINTENANCE...........................................7
A. Replace Electrode..................................................7
ERROR DISPLAYS AND TROUBLESHOOTING ……..8
SPECIFICATIONS .........................................................8
1
INITIAL INSPECTION AND ASSEMBLY
Carefully unpack the instrument and accessories. Inspect for
damages made in shipment. If any damage is found, notify your
Jenco representative immediately. All packing materials should be
saved until satisfactory operation is confirmed.
BEFORE YOUR FIRST USE
A. Replace the Batteries
Replace the battery when the blinking
low battery indicator “BAT ” appears on
the lower left hand side of the LCD
screen. The instrument can operate
within specifications for
approximately2~3 hours after low
battery indicator appears.
1. Shown in the right figure.
2. Take off the battery cover.
3. Remove all of the old batteries and
insert a new set of batteries ensuring
the polarities are correct.
B. Soak the Electrode, if
necessary for up to 24 hours
1. Remove the electrode cap covering the VisionPlus ORP meter.
2. Soak the ORP electrode in standard solution or distilled
water for 10 minutes before first use or after storage.
C. Setup and Calibrate the Electrode and Meter
PCE-ORP 3 must be se tup and calibrated before your first use.
Please the instructions detailed in section follow USING VPCE-
USING PCE-ORP 3
2
12

Especificaciones del producto

Marca: PCE Instruments
Categoría: Equipo de medición
Modelo: PCE-ORP 3

¿Necesitas ayuda?

Si necesitas ayuda con PCE Instruments PCE-ORP 3 haz una pregunta a continuación y otros usuarios te responderán




Equipo de medición PCE Instruments Manuales

Equipo de medición Manuales

Últimos Equipo de medición Manuales