RGBlink DXP D0404 Manual de Usario

RGBlink Cambiar DXP D0404

Lee a continuación 📖 el manual en español para RGBlink DXP D0404 (1 páginas) en la categoría Cambiar. Esta guía fue útil para 12 personas y fue valorada con 4.5 estrellas en promedio por 2 usuarios

Página 1/1
For full installation, configuration, and operation details, please refer to
the DXP D0404 user manual, which is available at www.rgblink.com.
Front Panel
DVI Output
RS232 OUT
DVI Input
Connections
Back Panel
Power On
DXP D0404 Quick Start
Rev 1.0
Page 1 of 1
Indicator
1
2
4
5
Power IEC-3 port
Address: S603-604 Weiye Building Torch Hi-Tech Industrial Development Zone, Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax:00865925771202
Email: sales@rgblink.com http://www.rgblink.cn
Power: The red power indicator is on when there is
power supply.
Mode: When switch audio and image at the same
time, the yellow mode indicator is on
( Function reserved).
Com: When connect device for cascade, the green
Com indicator is on.
Push power button switch to ON position, the POWER
indicator on the front panel will light, and the device is
in normal operation.
Plug in power cord which has IEC connector, DXP
D0404 support AC power from 85 to 264, 50-60Hz,
which means world wide compatible.
Step 6-Power
Step 3-DVI Output
Step 2-DVI Input
Used to input DVI from DVI player or
computer with DVI connector.
Connect to the monitor or LED control
system which has DVI interface.
IR Receiver
OUTPUT
Indicator
1
2
3
4Lock
IR Receiver
Can receive the infrared signal.
OUTPUT
OUTPUT1, OUTPUT2, OUTPUT3, OUTPUT4 are
corresponding to OUTPUT1, 2, 3, 4 on back panel.
In OUTPUT 1 area, press any number key of 1, 2, 3,
4, the key lights, user can switch any input of 1, 2, 3,
4 to OUTPUT 1.
User can also operate it by infrared remote control.
Same operations with OUTPUT2, OUTPUT3 and
OUTPUT4.
Turn off or disconnect all equipment power sources.
Step 1-Mounting
Lock
Lock key. Press it, the key lights, operations in
OUTPUT area are locked, also for the infrared remote
controlling. Press it again, the key is off, locking
function is cancelled.
Power Switch
RS232 IN
36
Connections
Remote control port for software.
Step 4-RS232 IN
RS232 OUT is serial communication interface of
multiple devices cascading control, it can connect
devices by DB9 serial cable.
Step 5-RS232 OUT
VIEW SIZE THE WORLD
DXP D0404 Quick Start
NOTE
This guide provides quick start instructions for an experienced
installer to set up and operate the DXP D0404.
Common Questions and Solution
Power indicator light is off or blinks
1. Check whether plug in the power cord, and press the
switch to ON position;“ ”
2. Check whether the power cable is connected, and in
good connection;
3. If above without problem, then the power indicator is
damaged.
Output images shake or cannot full screen
display
Each corresponding read EDID file from output display
is different, and cause the synthetic EDID file cannot be
consistent with the EDID files from display. Users can
u s e the sa m e t y p e o f d i s pl a y s f ro m t h e s am e
manufacturer, or displays with the same EDID files.

Especificaciones del producto

Marca: RGBlink
Categoría: Cambiar
Modelo: DXP D0404

¿Necesitas ayuda?

Si necesitas ayuda con RGBlink DXP D0404 haz una pregunta a continuación y otros usuarios te responderán




Cambiar RGBlink Manuales

Cambiar Manuales

Últimos Cambiar Manuales