Draper VCB Luma 2 Manual de Usario

Lee a continuación 📖 el manual en español para Draper VCB Luma 2 (1 páginas) en la categoría pantalla de proyección. Esta guía fue útil para 13 personas y fue valorada con 4.5 estrellas en promedio por 2 usuarios

Página 1/1
Extension Brackets (Optional Equipment)
Ceiling Suspended (Hardware not included)
Wall Mounting (Hardware not included)
If you encounter any difficulties installing or servicing your unit, call your dealer or
Draper, Inc., Spiceland, Indiana, (765) 987-7999 or fax (765) 987-7142.
Copyright © 2013 Draper Inc. Form VCBLuma2_Inst13 Printed in U.S.A.
Installation/Operating Instructions
VCB LUMA 2 Spring Roller Operated Video Conferencing Background by Draper
Before You Begin
Read instructions through completely before proceeding.
Follow instructions carefully. Installation contrary to instructions invali-
dates warranty.
Unit should be accessible for complete removal should fabric become
damaged or should other service be required.
Unit should be installed level (using a carpenter’s level).
Nothing should be fastened to dowel or background.
NOTE: Unit has been thoroughly inspected and tested at factory and
found to be operating properly prior to shipment.
Installation
Your Luma 2 Video Conferencing Background can be mounted on a wall or
suspended from the ceiling or extension brackets. It must be mounted level
and .with the flat back parallel to the wall
The unit (or extension brackets) should be mounted into studs or blocking in
the wall/ceiling, or in drywall (minimum thickness
1
/
2
") with specified anchors.
For any other type of installation, follow all local building and safety codes.
Steel studs, concrete or cinder block walls and all other types of non-wood
frame construction require the use of special screws or anchors.
The selection of appropriate mounting hardware should be made by a
qualified professional installer. Draper does not recommend hanging the
VCB Luma 2 using chains. Using chains may allow the roller to lock in
the fully extended position, and prevent the background from retracting
into the case.
Use the holes at the back
of the mounting bracket for
flush wall mounting.
Recommended hardware:
For mounting into wood or
wall stud, use #10 x 1
1
/
4
"
wood screws; for mounting
into drywall (minimum
1
/
2
"
thick), use
3
/
16
" toggle bolts
or
3
/
16
" molly bolts.
Use the holes at the of the front
mounting bracket for suspended
mounting. Position and properly anchor
screw eyes or other fasteners (not
included) into ceiling joists or other
solid surface. Suspend “S” hooks (not
included) from fasteners and hook
through mounting hole in the front
endcap. For added safety, crimp both
ends of the “S” hooks so the screen
cannot come off.
Recommended hardware: For mounting
into wood or ceiling joist, use two
3
/
16
"
x 1
1
/
4
" screw eyes and
3
/
16
" diameter
“S” hooks; for mounting into drywall
(minimum
1
/
2
" thick), use
3
/
16
" toggle or
molly bolts with
3
/
16
" “S” hooks.
Wall mount the brackets (not
included) using hardware
recommended for “Wall Mounting”
(at right). Then, suspend the unit
from the mounting hole in front
the endcap with “S” hooks (as in
“Ceiling Suspended”). For added
safety, crimp both ends of the
“S” hooks so the screen cannot
come off.
To lower, pull background down. —then allow background to retract Hesitate
very slowly until it locks in place.
To raise, pull background down and, while holding, allow for slow retraction
into the case to reduce risk of injury from falling unit.
Please Note: If the background stops between the full up or full down
positions, it will not retract completely back into the case. Please lower
the background to the full down position and then let it retract all the
way back into the case without stopping or slowing it down.
Operating Instructions—Standard
Recessed Mounting (Hardware not included)
Use the mounting hole front
in the endcap for recessed
mounting flush with the
ceiling. Attach angle (not
included) to unit then position
and properly anchor screw
fasteners (not included) into
ceiling joists or other solid
surface.
Recommended hardware:
For mounting into wood or
ceiling joist, use
3
/
16
" bolts.
®
Crimp
Crimp
Crimp
Crimp
Operating Instructions—AutoReturn
To lower, pull background down. —then allow screen to retract Hesitate very
slowly until it locks in place.
To raise, pull background down gently until it stops, then release.
Please Note:
Draper does not recommend hanging the VCB Luma 2 using chains.
Using chains may allow the roller to lock in the fully extended position,
and prevent the background from retracting into the case.
Please Note: Optional Floating Brackets are available with the VCB Luma 2.
They should be located on studs or joists. The bracket then attaches at any
almost any point along the case. For details, see separate instruction sheet
that ships with the Floating Wall Bracket.

Especificaciones del producto

Marca: Draper
Categoría: pantalla de proyección
Modelo: VCB Luma 2

¿Necesitas ayuda?

Si necesitas ayuda con Draper VCB Luma 2 haz una pregunta a continuación y otros usuarios te responderán