Gossen Metrawatt U1500 Manual de Usario
Lee a continuación 📖 el manual en español para Gossen Metrawatt U1500 (22 páginas) en la categoría Equipo de medición. Esta guía fue útil para 3 personas y fue valorada con 4.5 estrellas en promedio por 2 usuarios
Página 1/22
Energy Management
110011110000110101010100 011010
Manual for the Use of
Peak Load Optimizing Systems U1500
€
Manual for the Use of Peak Load Optimizing Systems
2
Preface
Consumption costs for energy sources such as electrical power, gas and district heating, which are billed as a rule based
upon measured power values, can frequently be reduced significantly with only minimal technical efforts. It is precisely
for this reason that in-house energy management should include an assessment for determining whether or not the use
of modern load optimizing systems is practical and efficient.
Detailed knowledge regarding the power supply contract conditions offered by various utility companies, utilized
process sequences and how they can be influenced, and existing equipment and how it is controlled, is necessary for the
preparation of an optimization concept.
This manual is intended to provide decision makers and system technicians with a tool for discovering potential
savings, and for evaluating the efficiency of an optimizing system.
GMC-I MESSTECHNIK GMBH
Südwestpark 15
90449 Nürnberg; Germany
Phone: +49 911 / 8602-0
www.gossenmetrawatt.com
Table of Contents
1 BASICS ...................................................................................................................................................................... 3
1.1 T S C CARIFFS FOR PECIAL ONTRACTS USTOMERS .................................................................................................. 3
2 OPTIMIZING SYSTEMS ........................................................................................................................................ 6
2.1 R AANGE OF PPLICATIONS .................................................................................................................................... 6
2.2 TECHNOLOGY ...................................................................................................................................................... 6
3 FACILITY ANALYSIS .......................................................................................................................................... 10
3.1 A T S C BNALYZING THE ARIFF CHEDULE AND ONSUMPTION ILLING .................................................................... 11
3.2 A I P L CNALYZING THE MPORT ROFILE AND THE OAD URVE ................................................................................ 11
3.3 E AQUIPMENT NALYSIS ....................................................................................................................................... 13
3.4 D R P SETERMINING EALISTIC OTENTIAL AVINGS ................................................................................................. 14
4 TECHNICAL IMPLEMENTATION ................................................................................................................... 15
4.1 I CNSTALLING THE OMPONENTS .......................................................................................................................... 15
4.2 S P E P UIGNALS ROVIDED BY THE LECTRICAL OWER TILITY ................................................................................ 15
4.3 B C CUS AND ONTROL ABLES .............................................................................................................................. 16
4.4 R E EETROFITTING XISTING QUIPMENT ................................................................................................................ 16
4.5 D M F S T C P OEMAND ANAGEMENT AS A IRST TEP OWARDS OMPREHENSIVE LANT PTIMIZATION ......................... 16
5 CALCULATING AMORTIZATION TIME ........................................................................................................ 16
6 CONCLUSION ........................................................................................................................................................ 16
APPENDIX A TARIFF / CONSUMPTION CHECKLIST .................................................................................. 17
APPENDIX B EQUIPMENT CHECKLIST .......................................................................................................... 18
APPENDIX C ECONOMY CHECKLIST ............................................................................................................. 20
Manual for the Use of Peak Load Optimizing Systems
3
1 Basics
1.1 Tariffs for Special Contracts
Customers
As a rule, the billing price invoiced to electrical utility
customers with special contracts differentiates between
kilowatt-hour rates for energy consumption (in cents
per kWh), and demand rates for maximum power
demand (in € per kW).
There are thus two different ways to reduce overall
costs: by reducing energy costs and power costs:
1. Reduced energy costs can only be achieved by
permanently diminishing superfluous energy
consumption, or by shifting energy import from
high tariff periods to the less expensive low tariff
periods. Savings can also be realized through the
use of more economical production equipment.
Potential savings of this type have already been
taken advantage of to a great extent in many cases,
or are economically impractical due to the large
investments which would be required. Any further
reduction of energy costs would influence the
production process and the product, which cannot
be tolerated as a rule.
2. Reduced power costs can be achieved by leveling
off energy import by controlling production
equipment such that pronounced “chargeable
demand peaks” are avoided. This short-term
redistribution of imported energy is executed
automatically by means of so-called energy
management systems. Due to the fact that energy
import is generally only postponed for a few
minutes by the load optimizing process (i.e. energy
is not reduced), the effects on the production
process are usually imperceptibly minimal.
However, the customer must have a suitable import
profile to achieve savings of this sort, and the
concept and the utilized system must be ideally
matched to one another. In this case, power costs
can be significantly reduced by means of just a few
short, targeted interventions at the right point in
time, i.e. considerable savings can be achieved.
Individual customer import profiles determine
kilowatt-hour and demand rates.
In order to better understand the various factors which
play a role in load optimization, we must first take a
closer look at several physical relationships, as well as
the billing practices of the power utilities.
Active energy E (usually measured in kWh) and active
power P (usually measured in kW) demonstrate the
following relationships:
P = E / ΔT or E = P * ΔT
Power is thus consumed energy per specified time
period ΔT.
The following figure depicts the so-called “import
profile” (daily load curve) of a special contract
customer.
Power costs (symbolized by the red bar) are
determined based upon the highest demand peak
(usually measured as a 15 minute mean value) which
occurs during the billing period.
Energy costs (symbolized by the green bar) are
proportional to the green surface area: The larger the
surface area, the more energy has been consumed, i.e.
the more energy has been used in the manufacturing
process.
Power
1.1
1.0
0.8
0.6
0.2
0
0.4
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00
in MW
Import Profile
Chargeable demand Consumed energy
The power utility must be able to cover the customer’s
maximum power demands at all times, and must
therefore provide capacity (i.e. cables, transformers
and power plants) according to the customer’s greatest
intermittent power requirement, in order to prevent
short-term machine stoppages or blackouts at the
customer’s facility. As the above depicted profile
shows, capacity made available for the customer
(which is associated with great expense) goes to waste
most of the time.
The customer is required to order standby energy so
that the power utility is able to determine how much
capacity it will have to place at the disposal of the
special customer, and must make a proportionate
capital contribution to network costs for this service.
Special customers are thus not all equal where the
power utility is concerned. Customers with high power
demands and low energy consumption cause higher
costs in making power available than customers who
demonstrate uniform energy import.
The import profile of the “ideal customer” is shown in
the figure below:
Especificaciones del producto
Marca: | Gossen Metrawatt |
Categoría: | Equipo de medición |
Modelo: | U1500 |
¿Necesitas ayuda?
Si necesitas ayuda con Gossen Metrawatt U1500 haz una pregunta a continuación y otros usuarios te responderán
Equipo de medición Gossen Metrawatt Manuales
19 Septiembre 2024
18 Septiembre 2024
17 Septiembre 2024
16 Septiembre 2024
15 Septiembre 2024
14 Septiembre 2024
14 Septiembre 2024
13 Septiembre 2024
13 Septiembre 2024
13 Septiembre 2024
Equipo de medición Manuales
- Equipo de medición Bosch
- Equipo de medición Panasonic
- Equipo de medición DeWalt
- Equipo de medición Honeywell
- Equipo de medición Pioneer
- Equipo de medición Alecto
- Equipo de medición Amprobe
- Equipo de medición Silverline
- Equipo de medición Gude
- Equipo de medición Black And Decker
- Equipo de medición Beurer
- Equipo de medición Yato
- Equipo de medición Megasat
- Equipo de medición Meec Tools
- Equipo de medición Milwaukee
- Equipo de medición Extech
- Equipo de medición Victron Energy
- Equipo de medición ABB
- Equipo de medición Hazet
- Equipo de medición Metrix
- Equipo de medición Benning
- Equipo de medición Einhell
- Equipo de medición Voltcraft
- Equipo de medición Mitsubishi
- Equipo de medición Velleman
- Equipo de medición Vemer
- Equipo de medición Perel
- Equipo de medición Kyoritsu
- Equipo de medición IFM
- Equipo de medición Ideal
- Equipo de medición Flir
- Equipo de medición Grohe
- Equipo de medición Technoline
- Equipo de medición Soler And Palau
- Equipo de medición Continental Edison
- Equipo de medición Rossmax
- Equipo de medición Carrier
- Equipo de medición Testboy
- Equipo de medición Goclever
- Equipo de medición Danfoss
- Equipo de medición Hager
- Equipo de medición Bresser
- Equipo de medición TFA
- Equipo de medición Powerfix
- Equipo de medición Owon
- Equipo de medición Flex
- Equipo de medición Finder
- Equipo de medición Fluke
- Equipo de medición Fantini Cosmi
- Equipo de medición Eltako
- Equipo de medición Sekonic
- Equipo de medición EBERLE
- Equipo de medición Basetech
- Equipo de medición Be Cool
- Equipo de medición Laserliner
- Equipo de medición REV
- Equipo de medición Testo
- Equipo de medición Clean Air Optima
- Equipo de medición Bruder Mannesmann
- Equipo de medición Eastron
- Equipo de medición ORNO
- Equipo de medición RIDGID
- Equipo de medición Multimetrix
- Equipo de medición GW Instek
- Equipo de medición Logilink
- Equipo de medición SIIG
- Equipo de medición Reely
- Equipo de medición Muller
- Equipo de medición Werma
- Equipo de medición Greisinger
- Equipo de medición Beha-Amprobe
- Equipo de medición Kopp
- Equipo de medición Kern
- Equipo de medición Kogan
- Equipo de medición Kemo
- Equipo de medición Peak
- Equipo de medición Uni-T
- Equipo de medición H-Tronic
- Equipo de medición Elgato
- Equipo de medición Hikmicro
- Equipo de medición PeakTech
- Equipo de medición Sonel
- Equipo de medición Tru Components
- Equipo de medición Emko
- Equipo de medición Entes
- Equipo de medición KS Tools
- Equipo de medición Trumeter
- Equipo de medición Delta Ohm
- Equipo de medición Atmel
- Equipo de medición Qualita
- Equipo de medición MGL Avionics
- Equipo de medición Adwa
- Equipo de medición Chauvin Arnoux
- Equipo de medición Megger
- Equipo de medición AREXX
- Equipo de medición PCE Instruments
- Equipo de medición CEM
- Equipo de medición SHX
- Equipo de medición Hameg
- Equipo de medición TDE Instruments
- Equipo de medición Joy-it
- Equipo de medición Circutor
- Equipo de medición Wachendorff
- Equipo de medición Klein Tools
- Equipo de medición Duro Pro
- Equipo de medición Aerospace Logic
- Equipo de medición GMW
- Equipo de medición Janitza
- Equipo de medición Sanwa
- Equipo de medición MSW
- Equipo de medición Weidmüller
- Equipo de medición Qubino
- Equipo de medición HT Instruments
- Equipo de medición P3 International
- Equipo de medición Beckmann & Egle
- Equipo de medición Seek Thermal
- Equipo de medición INFICON
- Equipo de medición Motrona
- Equipo de medición Tempo
- Equipo de medición Camille Bauer
- Equipo de medición Blebox
- Equipo de medición Seaward
- Equipo de medición HOZO Design
- Equipo de medición Corentium
- Equipo de medición GQ
- Equipo de medición Tektronix
- Equipo de medición Dostmann Electronic
- Equipo de medición Murideo
- Equipo de medición SecuTech
- Equipo de medición NetPeppers
- Equipo de medición SensoProtect
- Equipo de medición Water-i.d.
- Equipo de medición ZKETECH
- Equipo de medición LabNation
- Equipo de medición Electronics International
- Equipo de medición Cliff
- Equipo de medición ClimeMET
- Equipo de medición Fixpoint
- Equipo de medición Kübler
- Equipo de medición AkYtec
- Equipo de medición Stahlwille
- Equipo de medición MASIMO
- Equipo de medición Milesight
- Equipo de medición Enda
- Equipo de medición CSL
- Equipo de medición Ermenrich
- Equipo de medición PICO
- Equipo de medición Siglent
- Equipo de medición Noyafa
- Equipo de medición Stamos
Últimos Equipo de medición Manuales
26 Octubre 2024
25 Octubre 2024
25 Octubre 2024
24 Octubre 2024
23 Octubre 2024
23 Octubre 2024
23 Octubre 2024
23 Octubre 2024
23 Octubre 2024
23 Octubre 2024